BILL DUNCAN RECEIVING COMMENDATION FROM DEPUTY SECRETARY OF DEFENSE GORDAN ENGLAND
PENTAGON HALL OF HEROS

Management Consulting

C&L 1985 – 1987

E&Y 1987 – 1990

just-in-time

  • Supervisor at C&L, Manager; Senior Manager at E&Y
  • Just-In-Time (aka: Lean Manufacturing) implementations
  • MRP II (aka: ERP) Implementations
  • Representative clients included Chicago Cutlery, TRAK International, Signode, AO Smith, McDonnell Douglas Aircraft. Representative results:
    • At Chicago Cutlery, utilized JIT (Lean Manufacturing) techniques to reduce inventory by 92%, floor space requirements by 51%, and product throughput times by 91%
    • At McDonnell Douglas Aircraft Company, implementation of a pull system for composite structural components reduced throughput times from 49.6 days to 13 days, and WIP inventory by 92%.

aircraft

  • Authored and co-authored several articles, including:
    • Co-authored Using JIT to Reduce Leadtime and Inventory with client in Purchasing World in August 1987
    • Authored Just In Time as a Strategic Weapon in Manufacturing Systems Magazine July 1988
    • Authored an article on preparing for successful JIT / Lean manufacturing called The Calm Before the Storm in October 1989 issue of P&IM Review
  • Authored Chapter on Just In Time Manufacturing in Tool & Manufacturing Engineers Handbook in 1988 and again in 1989
  • Authored 180 page hardback book: Just-In-Time in American Manufacturing (published by SME in 1990)
  • Earned NAPM certification in 1986

critical shortages chart